TELECOM PROJECTS COMPLETED

Completed

Some very special projects out of many, successfully executed by us.

An order from for M/s. WAANEEP SOLAR PVT.LTD providing ILL connectivity to solar power plants (for O&M operations)
1. M/s. Waaree Energies Ltd, Amelipalle(V), Gurramkonda (M), Chittoor(Dist)
2. M/s. Waaree Energies Ltd, Nagari, Chittoor(Dist).
has been completed successfully

EFM

Radio links for Inter connecting the audio codecs for LIVE Transmissions of FM broadcast. EFM Vijayawada.
Radio links for Inter connecting the audio codecs for LIVE Transmissions of FM broadcast. AIR Vijayawada,
Kadapa, Visakhapatnam, Kochi &Trivandrum (Kerala)
An order from OMSAI COM TRUST for providing ILL connectivity to omsai com trust, Maddi(V) , Padmanabham (M),Visakhapatnam (Dist) has been completed successfully.
An order from M/s. STRELING & WILSON for providing ILL connectivity to solar power plants (for O&M operations)
1.M/s Suryoday Energy Pvt. Ltd,Aragonda,Telangana
2.NVR Mahasolar,Mograle,Maharastra
3.FRV PLOT-2, KADAPA
4.FRV PLOT-8, KADAPA
5.M/s.TRANSFORM SUN ENERGY PVT.LTD., Baleedupally
has been completed successfully
An order from M/s. STRELING & WILSON for providing INTRA CONNECTIVITY OF PLANT SCADA between
A) M/s.SURYODAY ENERGY PVT.LTD,ARAGONDA (19 MW) solar power plant,Aragonda and M/s.SURYODAY ENERGY PVT.LTD (15MW ) solar power plant, Annaram.
B) 32 MW solar power plant,Thangadapally and 18 MW solar power plant, Patlur.
C) M/s.TRANSFORM SUN ENERGY PVT.LTD.,(54 MW) Solar power plant, Addakal, Mehaboobnagar dist,TS and M/s.TRANSFORM SUN ENERGY PVT.LTD.,(46MW) Solar power plant, Baleeduapalli, Mehaboobnagar dist, Tealangana.
D) M/s.SUN SHAKTI SOLAR POWER PVT.LTD(30MW) solar power plant, PEDDAYAPALLI, Kamareddy and M/s.SUN SHAKTI SOLAR POWER PVT.LTD(20MW) solar power plant, THIMMAKAPALLI, Kamareddy
E) 1. M/s.SOLAR EDGE POWER ENERGY PVT. LTD (50 MW )solar power plant, Parli,Maharastra and M/s. SOLAR EDGE POWER ENERGY PVT. LTD (16 MW) solar power plant, Parli,Maharastra
2. M/s.SOLAR EDGE POWER ENERGY PVT. LTD (16 MW )solar power plant, Parli,Maharastra and M/s. SOLAR EDGE POWER ENERGY PVT. LTD (14 MW) solar power plant, Parli,Maharastra
F) M/s. SOLAR EDGE POWER ENERGY PVT. LTD ( 42 MW) solar power plant, Mukthainagar,Maharastra and M/s. SOLAR EDGE POWER ENERGY PVT. LTD (8 MW ) solar power plant, Mukthainagar,Maharastra
has been completed successfully.
An order of District Medical&Health office for providing PTP connectivity for data over RF, from BSNL exchange,karwanga to District Medical&Health office, raghupathypet has been completed successfully.
The project from BSNL AP circle, to provide LAST MILE CONNECTIVITY over RF, to commercial tax boarder check posts of Telangana Government has been successfully completed.
An order of CUSTOMS OFFICE,KAKINADA for providing PTP connectivity for data over RF from Kakinada Main Telephone BSNL exchange to Customs office, Kakinada has been completed successfully.
A VHF 2Way radio voice communication project for M/s VENKATESHWARA HATCHERIES (VH group PUNE) providing voice communication to nearly 28 poultry farms & research centers, located in Sahyadri Mountain ranges of sky high Western ghats, covering Satara dist Maharashtra and adjoining areas of PUNE installing a VHF repeater system on SINHAGAD Hilltop. (1995)
A VHF 2Way radio voice communication network of 200No.s Handheld radios, 25No.s Vehicle mobiles and 3No.s High power repeaters, for Municipal Corporation of Hyderabad (MCH), for sanitation maintenance purpose. The network was established by us in 1995 and maintained by us till 2006. A masterpiece of 2way radio communication network, assisted MCH to win “Best Clean & Green City in India” award for 3 consecutive years. (1996).
A VHF 2Way radio voice communication project for District Collector, Mahaboobnagar, AP covering the entire revenue dist. with a high power VHF repeater on Manyamkonda hilltop, Mahaboobnagar dist. AP (1997)
A blend of wire & wireless communication, interfacing EPABX telephone lines with 2way VHF radio system working in the tunnels of world famous NAGARJUNASAGAR DAM, for the communication purpose of inspection Engineers of AP irrigation Dept.(1999)
Direct linking of 2 VHF repeaters providing direct communication from TTD temple complex to Administrative building in Thirupathi, for famous Balaji Temple of Thirumala Thirupathi Devasthanams(TTD) in AP. Direct communication between VHF Hand held radios from Thirupathi to Thirumala and vise versa, including the valleys and sky touching hillocks and dangerous curvy ghat roads. A communication system which could be never thought of before, and earned us a high degree of reputation (2000).
A VHF 2Way trunked radio network for Singareni Coal mines of Singareni Collieries Company Ltd.Kothagudem AP, with 70No.s hand-held VHF trunked radios (smartrunk II protocol) providing uninterrupted voice communication, even in 52Deg. Outdoor temperature (2002). Automatic Fascimile transmission (slow speed FAX) system over HF radios for ONGC, between KG Basin Rajamundry AP & KG Basin, near Jabalpur.(2002), which exhibited our technical competency.
The most prestigious KENWOOD 2way radio network for security personnel of NUCLEAR FUEL COMPLEX (NFC) Hyderabad, being used till date (2002).
A wonderful exhibition of our technical competency , in form of a communication network in Srisailam underground hydel generation project, one of the world’s engineering marvels, interconnecting PLCC (Power Line Carrier Communication) system, EPABX system and KENWOOD VHF radio network providing voice communication for the working engineers.(2003)
Comprehensive industrial communication project for ACC Cements Wadi,. KARNATAKA, (through TATA Projects Hyderabad) bringing various voice communication modes like EPABX telephones, VHF Radios and industrial Public Addressing system on to a common platform which made the cross mode communication a dream of any cement industry into a reality.(2003).
In-house developed and supplied more than 600 no.s of specialized communication systems to AP POLICE, to operate in Naxalite infected areas which is meant to provide ease and security for radio communication systems especially at the time of extremist attacks on police stations.(2004)
Non Line of Sight (NLOS) communication system for automatic remote control (PLCs controlling) applications of material handling machinery like stacker & reclimer in MAHA CEMENTS Kodad ,AP(2005).
A unique and first of it’s kind in railways, project done for PENNA CEMENTS Anathpur dist. AP. Remote changing of rail way points from a distance of 11Km. for controlling goods train traffic between PENNA CEMENT and ULTRATECH CEMENTS (2007).
4X E1 streams delivered over RF to RAILTEL CORPOATION in NANDED Maharashtra for interfacing RAILWAY ENGINEERING CONTROL LINE network.(2008)
Gujarat Petroleum corporation warehouse Kakinada AP, digital communication system for RF ID tag reading for their day today warehouse operations through Handheld RF ID readers. (2009).
District vide VHF 2way radio communication network inter connected to GSM network, for District Collector Khammam, AP covering all Tahasil and RDO offices with 2no.s KENWOOD high power repeaters covering the interior and tribal areas along the GODAVARI river in Khammam dist. A P. (2009)
District vide VHF 2way radio communication network inter connected to GSM network, for District Collector GUNTUR, covering all 60 Tahasil and RDO offices with 2no.s KENWOOD high power repeaters covering the entire GUNTUR Dist AP.(2010-2011).
Nearly 50 Engineering colleges in AP, provided with PTP connectivity for data over RF, from BSNL exchanges, ranging from 2Kms to 17 Kms distance, under prestigious NMEICT project of MHRD Govt. of INDIA(2011-12).
Nearly 10 Cement Plants in AP and KARNATAKA so far, provided with industrial automation communication solutions over wireless for moving platform application.

AUTOMATION PROJECTS COMPLETED

Sterling & Wilson

We supplied and installed a REDUNDANCY RTU PANEL(SEIMENS) at M/s. Sterling and Wilson Pvt Ltd.,( FRV 50MW Plot-8) Solar power plant, Veligallu(V),Galiveedu(M),Kadapa(Dist.), A.P. The DAS has been successfully integrated to SRLDC, Bangalore and NLDC, Delhi in IEC-104 protocol.
We supplied and installed a REDUNDANCY RTU PANEL (SEIMENS) at M/s. Sterling and Wilson Pvt Ltd.,( FRV 50MW Plot-2) Solar power plant, Thumkunta(V),Galiveedu(M),Kadapa(Dist.), A.P. The DAS has been successfully integrated to SRLDC, Bangalore and NLDC, Delhi in IEC-104 protocol.
We supplied and installed a REDUNDANCY RTU PANEL (SEIMENS) at STERLING&WILSON SOLAR PRIVATE LIMITED, (50 MW Solar power plant), N.P.Kunta,Ananthapur(Dist.), A.P. The DAS has been successfully integrated to SRLDC, Bangalore and NLDC, Delhi in IEC-104 protocol .
This Project has been completed successfully.
NV VOGT 10 MW Solar power project injecting 33kv level to PALWAI 132kv/33kv substation,Mahaboobnagar dist.Telangana. Generation data was successfully integrated to TS SLDC,Vidyutsodha,Hyderabad. DAS utilised Schneider Micom C264C RTU and data transferred in IEC-104 protocal to TS SLDC through AIRTEL MPLS VPN circuit.

SUZLON

We supplied and installed a SCHNEIDER main & standby configuration RTU panel at 132/33KV SS,Uravakonda. The substation data was collected to SCHNEIDER main & standby configuration RTU panel and transferred to 132/33KV SS,Guntakal through PLCC link, where we supplied and installed another SCHNEIDER main & standby configuration RTU panel. Both substations data was successfully integrated to AP TRANSCO SLDC and communication through PLCC link.
We supplied and installed a SCHNEIDER RTU panel at Rudra Solarfarms Limited(15 MW Solar) Power Plant,Achampet,Telangana state. The plant data was successfully integrated to TS SLDC in IEC-104 protocol and communication through AIRTEL MPLS VPN circuit.
We supplied and installed a SCHNEIDER RTU panel at Vayudoot Solarfarms Limited (15 MW Solar) Power Plant, Bhainsa,Telangana state. The plant data was successfully integrated to TS SLDC in IEC-104 protocol and communication through AIRTEL MPLS VPN circuit.
We supplied and installed a SCHNEIDER RTU panel at Amun Solarfarms Limited (15 MW Solar) Power Plant,Kamareddy,Telangana state. The plant data was successfully integrated to TS SLDC in IEC-104 protocol and communication through AIRTEL MPLS VPN circuit.
We supplied and installed a SCHNEIDER RTU panel at Avighna Solarfarms Limited (15 MW Solar) Power Plant, Ramannapet,Telangana state. The plant data was successfully integrated to TS SLDC in IEC-104 protocol and communication through AIRTEL MPLS VPN circuit.

ADVENT ENGINEERS

We recently completed five projects in MAHARASTRA for M/S.MALPANI GROUP through M/S. ADVENT ENGINEERS for SUZLON WIND POWER SUBSTATIONS and integrated the bay data to MUMBAI SLDC,KALWA

We supplied and installed a SCHNEIDER RTU panel at M/s GIRIRAJ ENTERPRISES,Nigade 33/220kv Substation,A/P. Nigade, Tal-Patan,Dist: Satara-415103, MH, India. The bay data was successfully integrated to MUMBAI SLDC,KALWA in IEC-104 protocol.
We supplied and installed a SCHNEIDER RTU panel at M/s GIRIRAJ ENTERPRISES,33/132kv Substation, Amberi,Tal-Koregaon,Dist: Satara-415103, MH, India.The bay data was successfully integrated to MUMBAI SLDC,KALWA in IEC-104 protocol.
We supplied and installed a SCHNEIDER RTU panel at M/s GIRIRAJ ENTERPRISES,33/11KV Sanmadi Sub-station,A/P .Sanmadi, Tal-Jath, Dist- Sangli,Pin Code – 416404. Maharashtra. The bay data was successfully integrated to MUMBAI SLDC,KALWA in IEC-104 protocol.
We supplied and installed a SCHNEIDER RTU panel at M/s SUZLON,33/132Kv Substation Plot No-A-12,MIDC Malegaon,Sinnar, Dist. - Nasik - 422 103, MH, India The bay data was successfully integrated to MUMBAI SLDC,KALWA in IEC-104 protocol.
We supplied and installed a SCHNEIDER RTU panel at M/s GIRIRAJ ENTERPRISES,33/220KV Vankusavade Sub-Station,Tal –Patan, Dist- Satara,Pin Code – 415014 Maharashtra,India. The bay data was successfully integrated to MUMBAI SLDC,KALWA in IEC-104 protocol.

Contact Us